1-1hit |
Ze Cang GU Shoichiro YAMADA Kunio FUKUNAGA Shojiro YONEDA
A new algorithm for timing driven placement based on the fuzzy theory is proposed. In this method, the signal delay on the longest path, the chip area and the total wire length can be simultaneously minimized. Introducing the probability measures of fuzzy events, falling down into the local optimal solutions can be avoided. At first, we define the fuzzy placement relation using the graph distance matrix and fuzzy distance relation matrix, and we give a new placement method based on the fuzzy placement relation and the probability measures of fuzzy events. Secondly, we extend this placement method so as to apply to the timing driven placement problem by introducing a fuzzy membership functions which represent the signal delay on the longest path and the chip area. Finally, experimental results are shown to compare our method with one of the previous methods.