1-1hit |
Kou WADA Tsuneo OKUBO Satoshi TAZAWA Tetsuma SAKURAI Eisuke ARAI
A scalable and flexible ASIC CIM system distributed on UNIX workstations, ORCHARD , has been developed. It is designed from three viewpoints: (1) cost and TAT reduction in system construction, (2) flexibility in data management for quality control, and (3) precise and quick scheduling and effective lot tracking to control TAT for each lot. The concept of a "virtual machine" is introduced to connect equipment having various protocols to a host system. The virtual machine is automatically generated at an average automatic generation ratio of as high as 89%, which leads to a reduction in cost and TAT in system construction. Data for quality control is managed by changing flexibly the "data processing recipe." This recipe defines screen format, data collected from equipment, and data transfered from various databases. Precise scheduling of lots with various levels of priority is achieved by introducing a priority evaluation function, thereby reducing scheduling time to 1/20 that for manual scheduling.