In this paper we discuss the estimation of effort needed to update program codes according to given design specification changes. In the Object-Oriented incremental development (OOID), the requirement changes occur frequently and regularly. When a requirement change occurs, a design specification is changed accordingly. Then a program code is updated for given design specification change. In order to construct the development plan dynamically, a simple and fast estimation method of efforts for code updating is strongly required by both developers and managers. However, existing estimation methods cannot be applied to the OOID. We therefore try to propose a straightforward approach to estimate effort for code updating, which reflects the specific properties of the OOID. We list up following factors of the effort estimation for OOID: (1) updating activities consist of creation, deletion, and modification, (2) the target to be updated has four kinds of types (void type, basic type, library type, and custom type), (3) the degree of information hiding is classified into private, protected and public, and (4) the degree of inheritance affects updating efforts. We then propose a new formula E(P,σ) to calculate the efforts needed to update a program P according to a set of design specification changes σ. The formula E(P,σ) includes weighting parameters: Wupd, Wtype, Winf-h and Winht according to the characteristics (1), (2), (3) and (4), respectively. Finally, we conduct experimental evaluations by applying the formula E(P,σ) to actual project data in a certain company. The evaluation results statistically showed the validity of the proposed approach to some extent.
The copyright of the original papers published on this site belongs to IEICE. Unauthorized use of the original or translated papers is prohibited. See IEICE Provisions on Copyright for details.
Copy
Satoru UEHARA, Osamu MIZUNO, Tohru KIKUNO, "A New Approach to Estimate Effort to Update Object-Oriented Programs in Incremental Development" in IEICE TRANSACTIONS on Information,
vol. E85-D, no. 1, pp. 233-242, January 2002, doi: .
Abstract: In this paper we discuss the estimation of effort needed to update program codes according to given design specification changes. In the Object-Oriented incremental development (OOID), the requirement changes occur frequently and regularly. When a requirement change occurs, a design specification is changed accordingly. Then a program code is updated for given design specification change. In order to construct the development plan dynamically, a simple and fast estimation method of efforts for code updating is strongly required by both developers and managers. However, existing estimation methods cannot be applied to the OOID. We therefore try to propose a straightforward approach to estimate effort for code updating, which reflects the specific properties of the OOID. We list up following factors of the effort estimation for OOID: (1) updating activities consist of creation, deletion, and modification, (2) the target to be updated has four kinds of types (void type, basic type, library type, and custom type), (3) the degree of information hiding is classified into private, protected and public, and (4) the degree of inheritance affects updating efforts. We then propose a new formula E(P,σ) to calculate the efforts needed to update a program P according to a set of design specification changes σ. The formula E(P,σ) includes weighting parameters: Wupd, Wtype, Winf-h and Winht according to the characteristics (1), (2), (3) and (4), respectively. Finally, we conduct experimental evaluations by applying the formula E(P,σ) to actual project data in a certain company. The evaluation results statistically showed the validity of the proposed approach to some extent.
URL: https://global.ieice.org/en_transactions/information/10.1587/e85-d_1_233/_p
Copy
@ARTICLE{e85-d_1_233,
author={Satoru UEHARA, Osamu MIZUNO, Tohru KIKUNO, },
journal={IEICE TRANSACTIONS on Information},
title={A New Approach to Estimate Effort to Update Object-Oriented Programs in Incremental Development},
year={2002},
volume={E85-D},
number={1},
pages={233-242},
abstract={In this paper we discuss the estimation of effort needed to update program codes according to given design specification changes. In the Object-Oriented incremental development (OOID), the requirement changes occur frequently and regularly. When a requirement change occurs, a design specification is changed accordingly. Then a program code is updated for given design specification change. In order to construct the development plan dynamically, a simple and fast estimation method of efforts for code updating is strongly required by both developers and managers. However, existing estimation methods cannot be applied to the OOID. We therefore try to propose a straightforward approach to estimate effort for code updating, which reflects the specific properties of the OOID. We list up following factors of the effort estimation for OOID: (1) updating activities consist of creation, deletion, and modification, (2) the target to be updated has four kinds of types (void type, basic type, library type, and custom type), (3) the degree of information hiding is classified into private, protected and public, and (4) the degree of inheritance affects updating efforts. We then propose a new formula E(P,σ) to calculate the efforts needed to update a program P according to a set of design specification changes σ. The formula E(P,σ) includes weighting parameters: Wupd, Wtype, Winf-h and Winht according to the characteristics (1), (2), (3) and (4), respectively. Finally, we conduct experimental evaluations by applying the formula E(P,σ) to actual project data in a certain company. The evaluation results statistically showed the validity of the proposed approach to some extent.},
keywords={},
doi={},
ISSN={},
month={January},}
Copy
TY - JOUR
TI - A New Approach to Estimate Effort to Update Object-Oriented Programs in Incremental Development
T2 - IEICE TRANSACTIONS on Information
SP - 233
EP - 242
AU - Satoru UEHARA
AU - Osamu MIZUNO
AU - Tohru KIKUNO
PY - 2002
DO -
JO - IEICE TRANSACTIONS on Information
SN -
VL - E85-D
IS - 1
JA - IEICE TRANSACTIONS on Information
Y1 - January 2002
AB - In this paper we discuss the estimation of effort needed to update program codes according to given design specification changes. In the Object-Oriented incremental development (OOID), the requirement changes occur frequently and regularly. When a requirement change occurs, a design specification is changed accordingly. Then a program code is updated for given design specification change. In order to construct the development plan dynamically, a simple and fast estimation method of efforts for code updating is strongly required by both developers and managers. However, existing estimation methods cannot be applied to the OOID. We therefore try to propose a straightforward approach to estimate effort for code updating, which reflects the specific properties of the OOID. We list up following factors of the effort estimation for OOID: (1) updating activities consist of creation, deletion, and modification, (2) the target to be updated has four kinds of types (void type, basic type, library type, and custom type), (3) the degree of information hiding is classified into private, protected and public, and (4) the degree of inheritance affects updating efforts. We then propose a new formula E(P,σ) to calculate the efforts needed to update a program P according to a set of design specification changes σ. The formula E(P,σ) includes weighting parameters: Wupd, Wtype, Winf-h and Winht according to the characteristics (1), (2), (3) and (4), respectively. Finally, we conduct experimental evaluations by applying the formula E(P,σ) to actual project data in a certain company. The evaluation results statistically showed the validity of the proposed approach to some extent.
ER -